Site start
Housing site start — Mallow
Mallow, Cork
2 commencement notices · latest start date 25 Dec 2025 · planning reference given
Planning ABP -312640-22 · Planning application
- Commencement notices
- 2
- Latest start date
- 25 Dec 2025
- Latest notice
- 176 m²
- Planning reference
- ABP-312640-22
- Location
- Mallow, Cork
Location
Where the site is
- Area
- Mallow, Cork
- County
- Cork
Addresses on the notices
- Rose Vale, Annabella, Mallow, Co
- Rose Bank, Annabella, Mallow, Co
- Notice source points are up to 340 m apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 52.143099, -8.665882 Open point
- Public notice source · 52.140403, -8.663519 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-312640-22. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a 3 Story Duplex Residential Apartment Consisting of 1No (1 Bed) Apartment & 1No (3-Bed) Duplex Apartment and Associated Site Works at Rose Vale, Annabella, Mallow, Co. Cork.
Floor area stated for this source: 176 m².
Source unit value with scope not stated: 2 units. It is not presented as notice-specific scale.
Proposed Construction of (Phase 2) 63No. Residential Units (1 - 63) and Associated Site Works at Rose Bank, Annabella, Mallow, Co. Cork.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.