Commencement notice group
Housing commencement notices — Portobello
Portobello, Dublin
1 unique commencement event · latest notified commencement 06 Oct 2014 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 06 Oct 2014
- Latest notice
- 1 house
- Planning references supplied
- None stated
- Public location
- Portobello, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Portobello, Dublin
- County
- Dublin
Notice location variants
- lower ground level on the front facade and new openings in the rear return on lower ground and upper ground levels CN0002779DC
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
PROTECTED STRUCTURE: The development will consist of the refurbishment of the existing dwelling and includes re-pointing of brickwork and re-rendering (front and rear), re-roofing of the main house and return (including the insertion of roof-lights and solar panels), refurbishment / replacement of sash windows and replacement of rainwater goods to the rear. New construction includes a new vertical slot window at lower ground level on the front facade and new openings in the rear return on lower ground and upper ground levels. Work to the front garden includes refurbishment of the front railings, re-pointing of entrance steps, construction of new bin / bike store and insertion of 2 utility meters. Work to the back garden includes reducing the finished ground level, making good the site boundary walls, construction of a new patio area and construction of a new timber shed. Internal refurbishment work includes re-plumbing/ re-wiring throughout, repair / replacement of internal plasterwork, new insulated slab to lower ground floor, 2 new internal openings, insertion of a new ensuite, internal plan alterations to the return and removal of fireplaces to the return. The application also includes redecoration throughout, landscaping and all associated site works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.