Site start
Unit 8, Dublin Airport Logistics Park, St. Margaret’s, St Margaret's
St. Margaret’s, Dublin
1 commencement notice · start date 14 Feb 2025 · no planning reference given
- Commencement notices
- 1
- Latest start date
- 14 Feb 2025
- Latest notice
- 644 m²
- Planning references
- None given
- Location
- Unit 8, Cedar Drive, Dublin Airport Logistics Park, St. Margaret’s, St Margaret's
Location
Where the site is
- Area
- St. Margaret’s, Dublin
- County
- Dublin
Addresses on the notices
- Unit 8, Cedar Drive, Dublin Airport Logistics Park, St. Margaret’s, St Margaret's
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Installations and fitting new stud partitions, glazed partitioning associated doors and joinery installations, ceiling panel, flooring, tape & joint and decorating all walls, feature MF ceiling & exposed ceiling and fire-rated MF ceiling below mezzanine floor. Mechanical and Electrical works comprising; new installations to suit the new layout configuration, general lighting and new task lighting, new power and ICT cabling, new HVAC installations, alterations to existing life safety systems to suit the new layout, and test and commissioning of all installations.
Floor area stated for this source: 644 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.