Commencement notice group
Housing commencement notices — Cabinteely
Cabinteely, Dublin
4 unique commencement events · latest notified commencement 30 Mar 2020 · planning reference supplied
- Unique commencement events
- 4
- Latest notified commencement
- 30 Mar 2020
- Latest notice
- 53 houses
- Planning references supplied
- D15A/0385
- Public location
- Cabinteely, Dublin
Public source geography
Site location
- Public site / locality
- Cabinteely, Dublin
- County
- Dublin
Public site labels seen across the notices
- Dublin 18, Dublin
- Dublin, Dublin
Notice coordinates differ materially, so no combined point is shown. Use the per-notice location actions in the timeline.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
House 31 to 83 Beechpark, Cabinteely, Dublin 18
Floor area stated for this source: 367,820 m².
Construction of two apartment buildings over a common lower ground floor level carpark and services area.
Floor area stated for this source: 17,032 m².
House 1 to 30 Beechpark, Cabinteely, Dublin 18
Floor area stated for this source: 117,840 m².
Enabling works for development including demolition of 10 no. houses
Floor area stated for this source: 112 m².
Overall development total stated in source: 143 houses.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.