Site start
Building extension site start — Malahide
Malahide, Dublin
1 commencement notice · start date 07 Mar 2017 · planning reference given
Planning F16B/0224 · Planning application
- Commencement notices
- 1
- Latest start date
- 07 Mar 2017
- Latest notice
- 1 unit
- Planning reference
- F16B/0224
- Location
- Malahide, Dublin
Location
Where the site is
- Area
- Malahide, Dublin
- County
- Dublin
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Extensions and alterations to No. 12 the Rise, Malahide, Co. Dublin being located in an ACA area (Architectural Conservation Area). The demolition of existing garage and store structure at rear, the construction of a single storey flat roof extension and two storey pitched roof extension to the rear, provision of attic level space with flat roof section to include rooflights and dormer window to rear elevation; the works include internal alterations and remodelling roof canopy at vehicular access and replacement garage and store to rear eastern boundary, minor modifications to the front elevation include replacement windows and porch.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.