Housing commencement notices — Dublin
Dublin, Dublin
1 unique commencement event · latest notified commencement 07 Oct 2024 · planning reference supplied
- Unique commencement events
- 1 2 public source rows · 1 duplicate representation consolidated
- Latest notified commencement
- 07 Oct 2024
- Latest notice
- 1 house
- Planning references supplied
- SD19A/0201
- Public location
- Dublin, Dublin
Verified project chain
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 2
- Exact completion events
- 0
- Open exact official planning record: SD19A/0201 South Dublin County Council
Exact appeal 305415 · Grant permission with revised conditions · 2019-12-17 · Open official case
Planning, commencement and completion remain separate exact-source events. Completion certificates are shown only after the official planning, commencement, certificate and PDF evidence chain passes; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file South Dublin County Council planning record Application details, status and decision record for SD19A/0201. South Dublin County Council Official link · not recently checked Exact official source shared from the planning and approval record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion. 1 duplicate source representation is consolidated under the canonical notice reference while every source remains visible beneath that event.
(1) Division of the existing site and the erection of 1 detached, two storey two bedroom dwelling of 96.8sq.m with a single storey element to the rear; (2) alterations to the existing side vehicular entrance to the side of the proposed dwelling; (3) demolition of the conservatory to the rear of the existing house to allow for the required area for rear garden space, garden structures and a section of the existing north-east boundary wall; (4) ancillary site works necessary to facilitate the development including SUDS surface water drainage, site works, boundary treatments and landscaping.
Floor area stated for this source: 97 m².
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
- BCMS open-data feed · CN0120223SD Notified commencement: 2024-10-07 Source checked: 2026-06-09T15:11:14Z Phase quantity stated in this source representation: 1 houseFloor area stated in this source representation: 97 m² Open source record Open official source
- NBCO historical file · NBCO:CN0120223SD Notified commencement: 2024-10-07 Source checked: 2026-08-13T05:18:58Z Source unit value stated in this representation: 1 houseFloor area stated in this source representation: 97 m² Open source record Open official source
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.