Site start
Building extension site start — Rathfarnham
Rathfarnham, Dublin
1 commencement notice · start date 10 Feb 2020 · planning reference given
Planning D19A/0016 · Planning application
- Commencement notices
- 1
- Latest start date
- 10 Feb 2020
- Latest notice
- 786 m²
- Planning reference
- D19A/0016
- Location
- Rathfarnham, Dublin
Location
Where the site is
- Area
- Rathfarnham, Dublin
- County
- Dublin
Addresses on the notices
- Danesmoate, Kellystown Road, Rathfarnham, Dublin 16
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Demolition/removal of existing barn used for the storage of estate maintenance equipment with a floor area of 185 sq.m.; new single storey storage building of 269 sq.m., consisting of storage areas, double garage and ancillary areas; new single storey extension to existing log store consisting of new machine shed/workshop and gardeners shed with a floor area of 124 sq.m.; including all associated site works. All at Danesmoate, Kellystown Road, Rathfarnham, Dublin 16. (Protected Structure)
Floor area stated for this source: 786 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.