Site start
PE hall — site start
Castleblayney, Monaghan
1 commencement notice · start date 10 Feb 2015 · planning reference given
Planning CB 12/1 & 14/40003
- Commencement notices
- 1
- Latest start date
- 10 Feb 2015
- Latest notice
- Scale not stated
- Planning reference
- 14/40003
- Location
- Castleblayney, Monaghan
Location
Where the site is
- Area
- Castleblayney, Monaghan
- County
- Monaghan
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
1. Removal of existing prefab classroom and prefab office plus demolition of existing boiler house and single staircase 2. Construction of a three storey extension (1,243m2) with metal pitched roof and roof-lights comprising classrooms, new stairs, offices, new boiler room ,stores & ancillary accommodation to south of existing main school building; construction of new stand alone two-storey PE hall (634m2)with metal pitched roof located on the north east corner of the school site ; construction of a new single storey extension with roof-lights ( 80m2) to west of the existing metalwork room and adjacent store; the provision of 4 temporary classrooms and temporary parking and site storage behind (to west of) existing building on the west campus 3. Redevelopment of existing school building including conversion of existing general purpose hall to provide music room and dining/kitchen/servery including two new doors to existing west elevation and 1 door to south elevation ; reorganisation of existing woodworking/construction studies rooms to include raising height of existing single storey roof and provision of new roof-lights. 4. Site works including the removal of 2no. pre-fabricated buildings, removal of one ball court , reorganisation of roadway and vehicular movement within school boundaries, provision of new ESB sub station, restructuring of parking provision to provide 41 parking spaces including 2 disabled spaces, bicycle parking frames ,provision of new steps and disabled access ramp, general landscaping; repair/reinstatement of existing south boundary; extension of existing oil storage tank; provision of new playing pitch adjacent to PE hall. Site works to include site set up/ hoarding and temporary construction entrances off Dublin/Carrickmacross Road . 5. The works will be carried out in two phases 1. Modifications to the stand alone PE hall building previously approved in planning permission CB12/1 resulting in a larger basketball regulation sports hall (inc
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.