Commencement notice group

Housing commencement notices — Naas

Naas, Kildare

2 unique commencement events · latest notified commencement 12 Aug 2024 · planning reference supplied

Unique commencement events
2
Latest notified commencement
12 Aug 2024
Latest notice
121 units
Planning references supplied
ABP-313276-22
Public location
Naas, Kildare

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
Naas, Kildare
County
Kildare

Notice location variants

  • the former Devoy Barracks, John Devoy Road, Naas, Co
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Official source links are available below.

  • Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-313276-22. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.
    Open official appeal/SHD case · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Development works under this commencement notice will form the second phase of a two-phase delivery of housing units referred to as Phase 1A and Phase 1B. Phase 1B includes the construction of 121nr. apartments / duplexes and a childcare facilitity and outdoor play area at the former Devoy Barracks, John Devoy Road, Naas, Co. Kildare. The duplexes are contained within Blocks A, K, L & M and the apartment block along with creche are contained within block A. The blocks range in height from 3-5 storeys. Ancillary site development works include 3 no. ESB sub-stations, bike stores, bin stores, plant rooms, public lighting & foul and surface water drainage; internal roads & footpaths; surface car parking and EV charging; site landscaping including children’s play area, wetlands/SUDs features, and boundary treatments.

Work stated for this notice 121 units Explicit phase quantity stated by the source.

Floor area stated for this source: 11,798 m².

Appeal reference ABP-313276-22
Notice 2 Commencement notice

Development works under this commencement notice will form the first phase of a two-phase delivery of housing units referred to as Phase 1A and Phase 1B. Phase 1A includes the construction of 98nr. dwelling units consisting of 42nr. terraced houses and 56nr. apartment / duplex apartment units at the former Devoy Barracks, John Devoy Road, Naas, Co. Kildare. All houses are provided within Blocks 1-9 and all duplexes within Blocks E, F, G H and J. The blocks range in height from 2-4 storeys. Ancillary site development works include 3 no. ESB sub-stations, bike stores, bin stores, plant rooms, public lighting & foul and surface water drainage; demolition of an existing single storey structure of c. 10.7sq.m on the eastern boundary of the site; internal roads & footpaths; surface car parking and EV charging; site landscaping including children’s play area, wetlands/SUDs features, and boundary treatments. The full reduced earthworks dig, primary below ground drainage infrastructure, attenuation tanks and ESB Substation for the overall site area, i.e. for both phase 1A and phase 1B, will be completed in Phase 1A.

Work stated for this notice 98 units Explicit phase quantity stated by the source.

Floor area stated for this source: 9,560 m².

Appeal reference ABP-313276-22

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.