Site start
Housing site start — Blackrock
Blackrock, Dublin
1 commencement notice · start date 29 Sep 2023 · planning reference given
Planning D22A/1026 · Planning application
- Commencement notices
- 1
- Latest start date
- 29 Sep 2023
- Latest notice
- Scale not stated
- Planning reference
- D22A/1026
- Location
- Blackrock, Dublin
Location
Where the site is
- Area
- Blackrock, Dublin
- County
- Dublin
Addresses on the notices
- first floor with windows to front and rear of dormer
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
extension and alterations to existing single storey semi- detached dwelling including demolition of existing rear and side extension; new single storey flat roofed extension to side and rear with 3 no. roof lights; existing hipped roof modified to create gable-ended roof with attic conversion comprising dormer structure to front and rear at first floor with windows to front and rear of dormer; new velux window to front; obscured glass bathroom window in gable side elevation; Modifications to front façade including incorporation of porch, new fenestration, front door and new render to façade and widening of front vehicular entrance
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.