Commencement notice group
Housing commencement notices — Athlone
Athlone, Westmeath
1 unique commencement event · latest notified commencement 09 Apr 2024 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 09 Apr 2024
- Latest notice
- 2,446 m²
- Planning references supplied
- None stated
- Public location
- Athlone, Westmeath
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 2
- Open exact official planning record: 21372 Westmeath County Council · checked 2026-07-29T15:36:26+00:00
Planning 21372 — CONDITIONAL · Decision 2021-08-30 · Final grant 2021-10-05
- Completion certificate recorded — source scope not stated Westmeath County Council · commencement CN0112274WH Certificate CC00000056360WH · First observed in the official monthly source 2024-04 14 units stated for this certificate · One certificate representation
- Completion certificate recorded — source scope not stated Westmeath County Council · commencement CN0112274WH Certificate CC00000057860WH · First observed in the official monthly source 2024-04 2 units stated for this certificate · One certificate representation
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Athlone, Westmeath
- County
- Westmeath
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Westmeath County Council planning record Application details, status and decision record for 21372. Official council planning portal Official link · last checked 29 Jul 2026 Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
a) 16 houses in total consisting of three 5-bed with study/office three- storey end-of- terrace houses; four 4-bed with study three-storey mid- terrace houses; three 4-bed with study three-storey e nd-of-terrace- houses; two 4-bed with study three- storey semi- detached houses; two 3-bed semi- detached dormer houses; one 2-bed detached dormer house; one 3-bed detached dormer house b) pedestrian connection link to St Joseph's Villas c) vehicular and pedestrian access from Galway Road and d) all ancillary site development works and services. The development is located within the curtilage of a protected structure, ref no.079, Boundary Marker, Galway Road. (The development is an amendment of the previously granted development, planning ref 18/7226)
Floor area stated for this source: 2,446 m².
Source unit value with scope not stated: 16 units. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.