Site start
Santry Cross, Ballymun Road, Dublin 9
Dublin 9, Dublin
1 commencement notice · start date 19 Mar 2019 · no planning reference given
- Commencement notices
- 1
- Latest start date
- 19 Mar 2019
- Latest notice
- 6,397 m²
- Planning references
- None given
- Location
- Santry Cross, Ballymun Road, Dublin 9
Location
Where the site is
- Area
- Dublin 9, Dublin
- County
- Dublin
Addresses on the notices
- Santry Cross, Ballymun Road, Dublin 9
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
7-Day Notice - Following significant fire and smoke damage, including consequent water damage at the Metro Hotel (Dublin Airport), Santry Cross, Ballymun Road, Dublin 9 works are proposed to the basement level to 5th floor level inclusive to bring the building back into use. The Scope of Works are detailed in this 7 Day Notice Submission.
Floor area stated for this source: 6,397 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.