Site start
Housing site start — Dublin
Dublin 11, Dublin
1 commencement notice · start date 01 Jun 2026 · planning reference given
Planning WEB1186/26 · Planning application
- Commencement notices
- 1
- Latest start date
- 01 Jun 2026
- Latest notice
- 204 m²
- Planning reference
- WEB1186/26
- Location
- Dublin 11, Dublin
Location
Where the site is
- Area
- Dublin 11, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of the demolition of the existing garage door, wall surrounding it and flat roof behind. The development will also consist of the construction of a new 2.4m tall timber side gates in the front garden and a new garden room and new rear shed in the back garden. Works to the existing house will include external wall insulation, altering the size of 3 no. existing window openings, and an attic conversion with a new pitched-roof dormer to the side and a new flat-roof dormer to the rear. The works will also include the widening of the vehicle entrance and all associated site works.
Floor area stated for this source: 204 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.