Site start
Housing site start — Raheny
Raheny, Dublin
1 commencement notice · start date 18 Mar 2019 · planning reference given
Planning 4400/18
- Commencement notices
- 1
- Latest start date
- 18 Mar 2019
- Latest notice
- 165 m²
- Planning reference
- 4400/18
- Location
- Raheny, Dublin
Location
Where the site is
- Area
- Raheny, Dublin
- County
- Dublin
Addresses on the notices
- land adjacent to 26 Maywood lawn, Raheny, Dublin 5
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a 4 bedroom, 2 storey high with pitched roof detached house with 2no car parking space, shared front entrance and associated site works at land adjacent to 26 Maywood lawn, Raheny, Dublin 5.
Floor area stated for this source: 165 m².
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.