Site start
Building extension site start — Saint Margaret's
Saint Margaret's, Dublin
1 commencement notice · start date 04 Jan 2021 · planning reference given
Planning F19A/0357 · Planning application
- Commencement notices
- 1
- Latest start date
- 04 Jan 2021
- Latest notice
- 329 m²
- Planning reference
- F19A/0357
- Location
- Saint Margaret's, Dublin
Location
Where the site is
- Area
- Saint Margaret's, Dublin
- County
- Dublin
Addresses on the notices
- ground floor level
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Alteration to the existing single storey flat roof, pre- fabricated building knowing as the welfare block with an additional single storey extension to the building at ground floor level.
Floor area stated for this source: 329 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.