Commencement notice group
Housing commencement notices — Dalkey
Dalkey, Dublin
1 unique commencement event · latest notified commencement 20 Jan 2026 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 20 Jan 2026
- Latest notice
- 1 house
- Planning references supplied
- D25A/0217/WEB
- Public location
- Dalkey, Dublin
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dalkey, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Extensions and alterations to existing dwelling to include removal of front porch and replacement with new single storey front extension and entrance canopy; conversion of existing garage; removal of pitched roofs to rear extensions and replacement with new flat roofs; alterations to rear conservatory to form new external courtyard and new rear extension to form garden room; new first floor extension to side elevation with pitched roof to match existing; new velux rooflight to front elevation; widening of existing vehicular gates to 3475mm; internal alterations and all associated site works
Floor area stated for this source: 30 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.