Commencement notice group
ground floor of glass double doors in modern timber stud wall from entrance hall
Dublin 2, Dublin
1 unique commencement event · latest notified commencement 07 Aug 2018 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 07 Aug 2018
- Latest notice
- 151 m²
- Planning references supplied
- None stated
- Public location
- Dublin 2, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin 2, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
7-Day Notice - Refurbishment and repair, including new railing to front with granite plinth and paving, replacement of modern timber and pvc window sashes with period style sash windows and refurbishment of window shutters, removal of roller shutter to front and replacement with modern bay window, replacement of modern internal doors with period style fire doors, replacement of modern plywood floor in entrance hall with cream coloured limestone paving, insertion at ground floor of glass double doors in modern timber stud wall from entrance hall to front office, insertion of double doors between front and rear room at ground floor level to match doors at first floor, change of use of lower ground floor from place of worship to office, three storey extension on the rear above lower ground floor level, with roof garden at ground floor level, placement of skylights on rear and side slopes of main roof, removal of roller shutter to rear and replacement with timber sheeted doors, removal of roofing felt off mews and replacement with blue/ black natural slate, insertion of leaded fan light over front door.
Floor area stated for this source: 151 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.