Commencement notice group

Building extension commencement notices — CORNELSCOURT

CORNELSCOURT, Dublin

1 unique commencement event · latest notified commencement 18 Apr 2025 · planning reference supplied

View full project timeline

Unique commencement events
1
Latest notified commencement
18 Apr 2025
Latest notice
1 unit
Planning references supplied
D24B/0297/WEB
Public location
CORNELSCOURT, Dublin

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
CORNELSCOURT, Dublin
County
Dublin

Notice location variants

  • first floor level, 6 no CN0127598DR
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0127598DR BCMS open-data feed

The development will consist of the demolition and reconstruction of existing single story extension to the side, the addition of side entrance to utility and window in place of garage door to the front. The works will also include the construction of a dormer type extension to the side at first floor level, 6 no. velux rooflights to main roof, insertion of circular window at first floor level to the front, all associated site works and utility connection

Work stated for this notice 1 unit Explicit phase quantity stated by the source.

Floor area stated for this source: 216 m².

Planning reference D24B/0297/WEB

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.