Site start
Building extension site start — Harolds Cross
Harolds Cross, Dublin
1 commencement notice · start date 24 Jul 2015 · planning reference given
Planning 3898/14
- Commencement notices
- 1
- Latest start date
- 24 Jul 2015
- Latest notice
- Scale not stated
- Planning reference
- 3898/14
- Location
- Harolds Cross, Dublin
Location
Where the site is
- Area
- Harolds Cross, Dublin
- County
- Dublin
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a part single, part 2 storey extension to 58 Shanid Road, Harold's Cross, Dublin 6 West. Development comprises demolition of the existing extension and construction on the site of a new two storey extension to the rear and side in block cavity wall construction with render finish to the walls, timber windows & doors, aluminum- framed rooflights and a membrane roof. The existing building is to be fitted with new timber-framed windows, the external walls are to be insulated internally, the attic is to be insulated between the existing joists and a new rooflight fitted over the existing bathroom on the first floor.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.