Site start
Housing site start — Dublin
Dublin
1 commencement notice · start date 24 Aug 2022 · planning reference given
Planning 3637/22 · Planning application
- Commencement notices
- 1
- Latest start date
- 24 Aug 2022
- Latest notice
- 272 m²
- Planning reference
- 3637/22
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
Addresses on the notices
- side of rear return at lower ground level
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
This building is a protected structure. The development will consist of: the conversion of the building from existing 2 apartment layout back into a single family home; Works to Rear Return - the replacement of existing modern window with a timber sash window, replacement of modern door with timber glazed door - both at side of rear return at lower ground level; two new timber sash windows at upper ground floor level of side of rear return in two new openings, replacement of modern door with timber glazed door at rear upper ground floor level of rear return, removal of modern external metal spiral stair and balcony between upper ground floor and first floor of rear return , replacement of modern door with new timber sash window at first floor level of rear return; internally in the return all levels removal of modern kitchens, bathrooms and partitions, insertion of new bathroom to rear return first floor level; Works to Main House - removal of modern spiral stair between lower and upper ground floor of main house and replacement with new timber stair, removal of modern kitchens and bathrooms from lower ground floor, replacement of existing floor slab, insertion of new partitions and wc at lower ground floor level of main house; removal of modern partitions on upper ground floor level of main house, new kitchen, new wall opening with new timber doors between upper ground floor level reception rooms, new wall opening to rear return on upper ground floor level of main house, new partitions and insertion of new bathroom on first floor level with raised floor to retain existing timber flooring below; upgrading of mechanical and electrical installations to the house, internal redecoration and all associated ancillary siteworks.
Floor area stated for this source: 272 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.