Site start
Housing site start — Ballymore Eustace
Ballymore Eustace, Kildare
1 commencement notice · start date 10 Jul 2015 · planning reference given
Planning 15145 · Council file · external
- Commencement notices
- 1
- Latest start date
- 10 Jul 2015
- Latest notice
- 1 house
- Planning reference
- 15145
- Location
- Ballymore Eustace, Kildare
Location
Where the site is
- Area
- Ballymore Eustace, Kildare
- County
- Kildare
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a new draught lobby to front of existing dwelling house, provision of new dormer to rear for fire escape from existing bedroom, provision of double door to replace existing single door to balcony on north elevation, provision of new velux window to front elevation, swapping an existing door for an existing window to the balcony on the southern elevation and all associated site works and services.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.