Site start
Housing site start — Salthill
Salthill, Galway
1 commencement notice · start date 03 Jan 2017 · no planning reference given
Planning 1656 · Council file · external
- Commencement notices
- 1
- Latest start date
- 03 Jan 2017
- Latest notice
- 29 houses
- Planning references
- None given
- Location
- Salthill, Galway
Location
Where the site is
- Area
- Salthill, Galway
- County
- Galway
Addresses on the notices
- Maoilín, Ballymoneen Road, Knocknacarra, Galway City
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Construction of 29 no. dwelling units at Maoilín, Ballymoneen Road, Knocknacarra, Galway City. The proposed development also consists of connection to an existing access road as part of existing development (planning permission no. 11/105), provision of a revised landscape design to a portion of the shared open space totalling 3,899sqm to include a garden pavilion and a landscaped amphitheatre meeting place, 2 no. private car spaces located in the front driveway of each house totalling 58 no. car spaces with 10 on- street visitor car spaces, public lighting, all associated site works and associated drainage works. The total development area is 3,601.6sqm
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.