Site start
Building extension site start — Dalkey
Dalkey, Dublin
1 commencement notice · start date 29 Jun 2017 · planning reference given
Planning D17A/0016 · Planning application
- Commencement notices
- 1
- Latest start date
- 29 Jun 2017
- Latest notice
- 193 m²
- Planning reference
- D17A/0016
- Location
- Dalkey, Dublin
Location
Where the site is
- Area
- Dalkey, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Extension of an existing playground by 193 sqm., comprising of the removal of an exiting 1.6m to 2.7m high embankment, the construction of a retaining wall, the infilling of the former embankment to the upper level, the relocation and extension of the perimeter fence and gates and all associated site works.
Floor area stated for this source: 193 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.