Site start
Balbriggan Primary Care Centre — site start
Balbriggan, Dublin
4 commencement notices · latest start date 21 Nov 2017 · planning reference given
Planning F12A/0341 · Planning application
- Commencement notices
- 4
- Latest start date
- 21 Nov 2017
- Latest notice
- Scale not stated
- Planning reference
- F12A/0341
- Location
- Balbriggan, Dublin
Location
Where the site is
- Area
- Balbriggan, Dublin
- County
- Dublin
Addresses on the notices
- Balbriggan Primary Care Centre, Dublin Street, Balbriggan, Co Dublin
- Balbriggan Primary Care Centre, Dublin St
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Fit out works to the third floor at Balbriggan Primary Care Centre, Dublin Street, Balbriggan, Co Dublin
Fit out of pharmacy retail unit with dispensary, tea station, consultation room, WC and store at Balbriggan Primary Care Centre, Dublin St. Balbriggan.
Revisions to expanded 1st Floor GP Clinic comprising 6 no. Consulting Rooms and supporting accommodation. Office fit out of Second Floor Room 3.
The demolition of 4 no. structures (total 371 sq.m.) including 1 no. habitable house, and the construction of a 3 no. storey Primary Care Centre building with ancillary professional healthcare support services, 1 no. restaurant/cafe unit, 1 no. retail unit, 1 no. pharmacy unit, 1 no. new vehicular entrance/exit onto Dublin Street, 1 no. loading bay on Dublin Street, 50 no. car parking spaces, 1 no. ESB substation, the reconfiguration of on street parking spaces, landscaping and all associated and ancillary site works (total floor area of buildings 4614 sq.m.). (total site area 0.38 Ha)
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.