Site start
Commercial site start — Ballyhaise
Ballyhaise, Cavan
2 commencement notices · latest start date 12 Feb 2024 · planning reference given
Planning 23/84 · Council file · external
- Commencement notices
- 2
- Latest start date
- 12 Feb 2024
- Latest notice
- 3,928 m²
- Planning reference
- 23/84
- Location
- Ballyhaise, Cavan
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 2
- Open exact official planning record: 23/84 Cavan County Council
- Completion certificate recorded — source scope not stated Cavan County Council · commencement notice Completion certificate · First observed in the official monthly source 2023-10 1 units stated for this certificate · One certificate representation
- Completion certificate recorded — source scope not stated Cavan County Council · commencement notice Completion certificate · First observed in the official monthly source 2024-02 2 units stated for this certificate · One certificate representation
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Ballyhaise, Cavan
- County
- Cavan
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Cavan County Council planning record Application details, status and decision record for 23/84. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Extension consisting of Production and Plant area with adjoining two storey Office Block including the Extension to the side of the existing building linked by a first-floor materials transfer bridge and the extension to the loading bay.
Floor area stated for this source: 3,928 m².
Ground Stabilisation Works & associated diversion of existing open drain,to provide the substructure to pad foundations,retaining walls & floors of future development (subject to another commencement notice).
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.