Commencement notice group
Commercial commencement notices — Dublin
Dublin 2, Dublin
2 unique commencement events · latest notified commencement 25 Aug 2026 · planning basis not stated
- Unique commencement events
- 2
- Latest notified commencement
- 25 Aug 2026
- Latest notice
- 1,244 m²
- Planning references supplied
- None stated
- Public location
- Dublin 2, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin 2, Dublin
- County
- Dublin
Notice location variants
- basement and ground and ancillary office floors above, total c SN0014689DC
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Replacement of existing 4th floor mansard roof level (c. 144 sqm) by new roof level (c. 260 sqm) with associated increase of c. 570 mm in overall height, continuous full-height glazing, external terraces to south and west and associated external escape staircase; rear extension (4-storey over basement with plant rooms at basement and ground and ancillary office floors above, total c. 194 sqm); external accessible platform lift from basement to footpath level onto St Stephen’s Green with associated changes to railings and plinth wall and all associated ancillary site works.
Floor area stated for this source: 1,244 m².
Demolition and enabling works at 44–45 St Stephen’s Green, Dublin 2 (), including soft strip, demolition of rear yard structures and oil tank, temporary works, hoarding and site setup only. Main construction, new roof level, rear extension, platform lift, window replacement, new plant, internal reconfiguration and final landscaping are excluded and will proceed under a separate 7 Day Notice.
Floor area stated for this source: 2,255 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.