Site start
Building extension site start — Sandymount
Sandymount, Dublin
1 commencement notice · start date 11 Mar 2016 · planning reference given
Planning 3978/15
- Commencement notices
- 1
- Latest start date
- 11 Mar 2016
- Latest notice
- Scale not stated
- Planning reference
- 3978/15
- Location
- Sandymount, Dublin
Location
Where the site is
- Area
- Sandymount, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
OPT OUT 1)demolition of an existing small (4.5m2) extension to the rear of the existing property. 2) a combination of single and two storey flat roof extensions to the rear providing 12.5m2 additional first floor area and 29.5m2 ground floor area 3) all ancillary site works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.