Commencement notice group
Housing commencement notices — Mountrath
Mountrath, Laois
1 unique commencement event · latest notified commencement 18 Mar 2024 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 18 Mar 2024
- Latest notice
- 1 house
- Planning references supplied
- None stated
- Public location
- Mountrath, Laois
Public source geography
Site location
- Public site / locality
- Mountrath, Laois
- County
- Laois
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Laois County Council planning record Application details, status and decision record for 23254. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Change of use of an existing workshop building to a single family two bedroom dwelling, consisting of alterations and refurbishment of the exterior and interior of the existing building (79m2) including new windows, new roof and rainwater goods. Construction of a new internal mezzanine floor (39m2), Provision of PV solar panels to the south pitch of the roof; Modification of the front boundary wall; Provision of a soakaway for surface water drainage; Provision of a new water supply and foul connection; Provision of hard and soft landscaping, and all ancillary works necessary to facilitate the development.
Floor area stated for this source: 118 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.