Commencement notice group
Housing commencement notices — Blackpool
Blackpool, Cork
3 separate notices · latest notified commencement 02 Dec 2020 · planning reference supplied
- Source notices
- 3
- Latest notified commencement
- 02 Dec 2020
- Latest notice
- 31 units
- Planning references supplied
- 1737392
- Public location
- Blackpool, Cork
Public source geography
Site location
- Public site / locality
- Blackpool, Cork
- County
- Cork
Public site labels seen across the notices
- Cork, Cork
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Application details, the decision and any documents published by the authority are available in the official planning file.
-
Official planning file Application details, decision and available documents Cork City Council · reference 1737392 Official council planning portal checked 29 Jul 2026 Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Redforge Road Phase 3 Block Types 3, 7, 9 & 10 - Construction of No's 1-9, 20-39, 79, 79A (Creche), 80 & 80A (Community Centre) - Block 9(No's 1-9) Construction of 9no. terraced dwellings consisting of 3no. 2 bed & 6no. 3 bed dwellings, Block 7(No's 20-39) - 20no. Apartments & Maisonettes consisting of 10 no. 3 bed duplex maisonettes and 10no. 2 bed GF Apartments. Block 3(No's 79 & 79A) - GF Creche building with 1 no. 2-bed apartment overhead and Block 10(No's 80 & 80A) GF Community Centre with 1 no. 2 bed apartment overhead and all associated ancillary site development works.
31 units · 3,074 m² · stated on this notice
Redforge Road Phase 2 Block Types 1, 2, 5 & 6 - Construction of No's 47-78 - Block Type 1(4no.) 16no. Apartments & Maisonettes consisting of 8no. 3 bed Maisonettes and 8no. 2 bed Apartments - Block Type 2(1no.) 4no. Apartments & Maisonettes consisting of 2no. 3 bed Maisonettes and 2no. 2 bed Apartments - Block Type 5(2no.) 8no. Apartments & Maisonettes consisting of 4no. 2 bed Maisonettes and 4no. 1 bed Apartments - Block Type 6(1no.) 4no. Apartments & Maisonettes consisting of 2no. 2 bed Maisonettes and 2no. 1 bed Apartments
32 units · 2,909 m² · stated on this notice
Redforge Road Development Phase 1 Block 8 - Construction of 7 no. terraced dwellings consisting of 5 no. 3 bed & 2 no. 2 bed dwellings & Block 4 - 10 no. Apartments & Maisonettes consisting of 5 no. 3 bed Maisonettes and 5 no. 2 bed Apartments. Total development will consist of 80 no. residential units, 25 no. 2 bed apartments, 25 no.3 bed duplex apartments, 6 no.1 bed apartments, 6 no. 2 bed duplex apartments, 5 no. 2 bed townhouses and 11 no. 3 bed townhouses. The proposed development also includes for the provision of a local community centre with 1 no. 2 bed apartment overhead and a creche building with 1 no. 2-bed apartment overhead, landscaping boundary treatments and all associated ancillary site development works.
17 units · 1,572 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.