Site start
Housing site start — Dublin
Dublin
1 commencement notice · start date 12 Feb 2025 · planning reference given
Planning WEB2203/24 · Planning application
- Commencement notices
- 1
- Latest start date
- 12 Feb 2025
- Latest notice
- 268 m²
- Planning reference
- WEB2203/24
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Demolition of existing detached sheds to rear; Alterations to existing house including demolition of single-storey extension to East and South (side and rear); construction of new two-storey extension to East and South (75.1 Sq.m), Single-storey extension to South and West (rear of house, 26.7 Sq.m); Reconstruction of roof (matching existing overall height) with two new gables to front (in lieu of one existing) and one new gable to rear; Alterations to elevations and fenestration throughout including rebuilding of covered porch area (8.8 Sq. m); Provision of solar panels to rear roof slope; Provision of rooflights, garden shed
Floor area stated for this source: 268 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.