Site start
Commercial site start — Mervue
Mervue, Galway
2 commencement notices · latest start date 06 Mar 2020 · planning reference given
Planning 18/62 · Council file · external
- Commencement notices
- 2
- Latest start date
- 06 Mar 2020
- Latest notice
- 578 m²
- Planning reference
- 18/62
- Location
- Monivea Road, Galway
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 1
- Open exact official planning record: 18/62 Galway City Council
- Completion certificate recorded — source scope not stated Galway City Council · commencement notice Completion certificate · First observed in the official monthly source 2018-12 1 units stated for this certificate · One certificate representation
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Mervue, Galway
- County
- Galway
Addresses on the notices
- Monivea Road, Galway
- Monivea Road, Mervue, Galway
- Notice source points are up to 1.3 km apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 53.284548, -9.022394 Open point
- Public notice source · 53.288556, -9.004652 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Galway City Council planning record Application details, status and decision record for 18/62. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a two storey office extension to the Main Factory Building with a total floor area of approximately 578m2.
Floor area stated for this source: 578 m².
The construction of an approximately 1600m2 extension to the main factory building. The development will also consist of the demolition of an existing store, disused wastewater treatment plant and ancillary buildings/ tanks and all associated site works.
Floor area stated for this source: 1,600 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.