Site start

13-17 Dawson Street, Dublin 2

Dublin 2, Dublin

1 commencement notice · start date 23 Jul 2018 · no planning reference given

Commencement notices
1
Latest start date
23 Jul 2018
Latest notice
985 m²
Planning references
None given
Location
13-17 Dawson Street, Dublin 2

Location

Where the site is

Area
Dublin 2, Dublin
County
Dublin

Addresses on the notices

  • 13-17 Dawson Street, Dublin 2
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

Notice 1 Commencement notice

Fit-out of existing shell and core office accommodation at 5th Floor, One Molesworth Street, Dublin 2. Works will comprise fit-out of the existing shell and core floorplate at 5th floor level office accommodation. The fit-out will include the provision of reception & waiting area, meeting rooms, phone booths, internal offices, open plan workspace, comms room, mail and store rooms, mothers/prayer/first aid room; and provision of raised access floors (with associated cavity barriers), including the provision of an internal ramp to provide level access to the external terrace, including installation of suspended ceilings, construction of internal glazed and stud partitions and provision of mechanical ventilation & air-conditioning to the internal accommodation. Provision of new service installations; including internal waste, water and drainage, mechanical & electrical, fire alarm, emergency lighting, general lighting & small power, and connection to the existing Landlord/base build services as-installed. The proposed works will also include the completion of the ‘Deferred Works’ as referred to in the Annex of the Certificate of Compliance on Completion (Ref: CCDC); relating to Commencement Notice 8369607, for the base build development at 11-17 Dawson Street, Dublin 2, as follows: 1:Floor finish to ensure Part M compliance giving level access in the office floor plates. 2: Mechanical ventilation / air conditioning installation within office floor plates. 3: Switches, outlets and control units to ensure Part M compliance within the office floor plates. 4: Fire and Life safety systems, including emergency lighting within the office floor plates. 5: All artificial lighting throughout the office floor plates.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 985 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.