Site start
13-17 Dawson Street, Dublin 2
Dublin 2, Dublin
1 commencement notice · start date 23 Jul 2018 · no planning reference given
- Commencement notices
- 1
- Latest start date
- 23 Jul 2018
- Latest notice
- 985 m²
- Planning references
- None given
- Location
- 13-17 Dawson Street, Dublin 2
Location
Where the site is
- Area
- Dublin 2, Dublin
- County
- Dublin
Addresses on the notices
- 13-17 Dawson Street, Dublin 2
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Fit-out of existing shell and core office accommodation at 5th Floor, One Molesworth Street, Dublin 2. Works will comprise fit-out of the existing shell and core floorplate at 5th floor level office accommodation. The fit-out will include the provision of reception & waiting area, meeting rooms, phone booths, internal offices, open plan workspace, comms room, mail and store rooms, mothers/prayer/first aid room; and provision of raised access floors (with associated cavity barriers), including the provision of an internal ramp to provide level access to the external terrace, including installation of suspended ceilings, construction of internal glazed and stud partitions and provision of mechanical ventilation & air-conditioning to the internal accommodation. Provision of new service installations; including internal waste, water and drainage, mechanical & electrical, fire alarm, emergency lighting, general lighting & small power, and connection to the existing Landlord/base build services as-installed. The proposed works will also include the completion of the ‘Deferred Works’ as referred to in the Annex of the Certificate of Compliance on Completion (Ref: CCDC); relating to Commencement Notice 8369607, for the base build development at 11-17 Dawson Street, Dublin 2, as follows: 1:Floor finish to ensure Part M compliance giving level access in the office floor plates. 2: Mechanical ventilation / air conditioning installation within office floor plates. 3: Switches, outlets and control units to ensure Part M compliance within the office floor plates. 4: Fire and Life safety systems, including emergency lighting within the office floor plates. 5: All artificial lighting throughout the office floor plates.
Floor area stated for this source: 985 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.