Site start
Housing site start — Tralee
Tralee, Kerry
1 commencement notice · start date 28 May 2020 · planning reference given
Planning 191243 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 28 May 2020
- Latest notice
- 1 house
- Planning reference
- 191243
- Location
- Tralee, Kerry
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 191243 Kerry County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Tralee, Kerry
- County
- Kerry
Addresses on the notices
- first floor level
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kerry County Council planning record Application details, status and decision record for 191243. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
(A) Demolish existing sunroom structure to the South Western elevation of the dwelling. (B) Proposed extensions to existing Sitting room and existing front bedroom on part footprint of the proposed demolished Sunroom on the South Western elevation of the dwelling. (C) Enclosure of existing open car port to provide a utility room and an enlarged toilet to the South Eastern elevation of the dwelling. (D) Proposed conventional stair access to first floor in lieu of existing spiral stairs located above the existing flat roof area and associated enclosure of proposed stairs at first floor level. (E) All associated elevational changes for the proposed works. (F) Removal of the existing septic tank and provision of a Mechanical Treatment unit and polishing filter in lieu of the existing septic tank and all with associated works
Floor area stated for this source: 229 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.