Site start

Housing site start — Blackrock

Blackrock, Dublin

1 commencement notice · start date 08 May 2023 · planning reference given

Planning D22A/0850 · Planning application

View full project timeline

Commencement notices
1
Latest start date
08 May 2023
Latest notice
Scale not stated
Planning reference
D22A/0850
Location
Blackrock, Dublin

Location

Where the site is

Area
Blackrock, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Construction of single storey extensions to the side/rear and alterati on/refurbishment works to existing house, including replacement of dormer extensions either side of existing main roof, provision of roof windows to side of existing main roof, and, provision of new/alteration of existing window/external door opes, all to existing (detached) house.

Work stated for this notice Scale not stated for this notice.
Planning reference D22A/0850

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.