Commencement notice group
Building extension commencement notices — Annacotty
Annacotty, Limerick
1 unique commencement event · latest notified commencement 14 Jun 2022 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 14 Jun 2022
- Latest notice
- 5,040 m²
- Planning references supplied
- 181263
- Public location
- Annacotty, Limerick
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 0
- Open exact official planning record: 181263 Limerick City and County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Annacotty, Limerick
- County
- Limerick
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Limerick City and County Council planning record Application details, status and decision record for 181263. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
(a) an extension to the main building comprising of the construction of an extended production hall with mezzanine plant space overhead, a predominantly 2 storey (part 3 storey) production support/utility block, expansion of the existing control room, a single storey loading bay, and roof access stairwell, all on the south side of the existing building (5,005 sqm); (b) the construction of a new plant and equipment to the rear of the building, including storage tanks, bunds, piperacks, a 15m high stack, and 2 new truck loading bays, (c) the relocation of an existing chemical storage shed (35 sqm), (d) the construction of an additional water retention pond along the southern boundary, and associated site works. A Natura Impact Statement has been prepared in respect of this planning application
Floor area stated for this source: 5,040 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.