Commencement notice group
Housing commencement notices — Kilkenny
Kilkenny, Kilkenny
1 unique commencement event · latest notified commencement 14 Feb 2022 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 14 Feb 2022
- Latest notice
- 1 house
- Planning references supplied
- None stated
- Public location
- Kilkenny, Kilkenny
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 0
- Open exact official planning record: 21260 Kilkenny County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Kilkenny, Kilkenny
- County
- Kilkenny
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kilkenny County Council planning record Application details, status and decision record for 21260. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The proposed works consist of the construction of a two-story extension to the rear and side of the existing dwelling. This extension contains on the ground floor, a larger kitchen, utility, living room and on the first-floor two-bedroom rooms and a bathroom. Alteration to the front façade consisting of the relocation of the existing front door to the gable facade to allow for internal rearrangements consisting of the relocation of stairs and new accessible WC. The exiting dwelling energy rating, u-values and airtightness are outdated. As part of the proposed works in order to try to upgrade the dwelling to meet compliance with TGD Part L, the existing dwelling is proposed to be wrapped with external insulation. The above-proposed extensions and works are all to facilitate the growing family as they require more living space and individual sleeping facilities, all in order to contribute long term occupation of them on Maudlin Street and future-proof the dwelling.
Floor area stated for this source: 189 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.