Commencement notice group
Housing commencement notices — Garristown
Garristown, Dublin
1 separate notice · latest notified commencement 26 May 2025 · planning references supplied
- Source notices
- 1
- Latest notified commencement
- 26 May 2025
- Latest notice
- 22 homes
- Planning references supplied
- F23A/0801 · ABP-320358-24
- Public location
- Garristown, Dublin
Public source geography
Site location
- Public site / locality
- Garristown, Dublin
- County
- Dublin
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of 10 detached two-storey four bedroom houses, 2 no. semi- detached two-storey four bedroom houses, 2 no. detached two-storey three bedroom houses, 2 no. semi- detached two-storey three bedroom houses and 4 no. semi-detached two- storey two bedroom houses, widen the Western side of existing Chapel Lane carriageway along the site frontage, provide new grass verge and public path along site frontage with Chapel Lane, new vehicular entrance, internal road and paths, public open space, landscaping, public lighting and all associated site works on lands to the West of Chapel Lane, Garristown.
22 homes · 2,830 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.