Site start
Single storey electrical room
Carrigtwohill, Cork
1 commencement notice · start date 13 Dec 2022 · no planning reference given
- Commencement notices
- 1
- Latest start date
- 13 Dec 2022
- Latest notice
- 224 m²
- Planning references
- None given
- Location
- Carrigtwohill, Cork
Location
Where the site is
- Area
- Carrigtwohill, Cork
- County
- Cork
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
1) Single storey electrical room 2) Single storey electrical room and E.S.B. room 3) EV Charging sub station to facilitate the charging of electric vehicles 4) Foam Deluge Building - Single storey building to house a foam storage tank which is used to supply foam deluge system for plant associated with the Merck site 5) Pump House - Single storey building that is used to house pumps.
Floor area stated for this source: 224 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.