Site start

Site start — Dublin

Dublin18, Dublin

1 commencement notice · start date 05 Aug 2021 · planning references given

Planning P/1611/18- DZ18A/0458/12/C1

Commencement notices
1
Latest start date
05 Aug 2021
Latest notice
4,413 m²
Planning references
DZ18A/0458/12 · P/1611
Location
Tully Park, Cherrywood, Dublin 18

Location

Where the site is

Area
Dublin18, Dublin
County
Dublin

Addresses on the notices

  • Tully Park, Cherrywood, Dublin 18
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

A New No. 24 Classroom School with No. 2 Special Needs Classrooms on Lands (c.0.74HA) in the Town-land of Laughanstown,Cherrywood,Dublin 18. (SDZ Development Area 8-Tully)

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 4,413 m².

Planning reference DZ18A/0458/12 Planning reference P/1611

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.