Commencement notice group

Housing commencement notices — Glasnevin

Glasnevin, Dublin

1 separate notice · latest notified commencement 08 Jun 2026 · planning reference supplied

Source notices
1
Latest notified commencement
08 Jun 2026
Latest notice
16 m²
Planning references supplied
WEB5769/25
Public location
Glasnevin, Dublin

Public source geography

Site location

Public site / locality
Glasnevin, Dublin
County
Dublin
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning referenceWEB5769/25

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0142945DC BCMS owner-supplied export

The works will include the construction of a single story flat roof extension to the rear of the property. The installation of two new roof lights to the proposed roof. Some internal alterations and refurbishment of the existing dwelling. All along with associated landscaping, site works and drainage and surface water soak pit.

16 m² · stated on this notice

Planning reference WEB5769/25

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.