Site start

Housing site start — Naas

Naas, Kildare

1 commencement notice · start date 12 Oct 2023 · planning reference given

Planning P82022-09

Commencement notices
1
Latest start date
12 Oct 2023
Latest notice
1 house
Planning reference
P82022-09
Location
Naas, Kildare

Location

Where the site is

Area
Naas, Kildare
County
Kildare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Demolition of existing single storey extension to rear of existing 2 storey end of terrace building. Refurbishment, internal alterations and single storey extension to the side of existing 2 storey end of terrace to create a 4 bedroom dwelling and all associated site works.

Work stated for this notice 1 house Explicit phase quantity stated by the source.

Floor area stated for this source: 120 m².

Planning reference P82022-09

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.