Site start

Building extension site start — Bray

Bray, Dublin

1 commencement notice · start date 22 Apr 2024 · planning reference given

Planning D21B/0562 · Planning application

View full project timeline

Commencement notices
1
Latest start date
22 Apr 2024
Latest notice
Scale not stated
Planning reference
D21B/0562
Location
Bray, Dublin

Location

Where the site is

Area
Bray, Dublin
County
Dublin

No usable public source coordinate or reviewed official planning boundary is available for this notice group.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

The development will consists of: Revision scheme of previously refused application ref: D21B/0377 on 09 September 2021. 1, Convert a two- storey building Attic to 2 no. of habitable rooms and sanitary facility with total floor area of 31.4 sq.m 2, A new dormer facing to rear garden; 3, rise roof ridge to align with highest ridge level of the two- storey building. 4, Install 3 no. of roof lights to the front and associated site works.

Work stated for this notice Scale not stated for this notice.
Planning reference D21B/0562

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.