Site start
Housing site start — Clontarf
Clontarf, Dublin 3, Dublin
1 commencement notice · start date 12 Feb 2020 · planning reference given
Planning 3281/18
- Commencement notices
- 1
- Latest start date
- 12 Feb 2020
- Latest notice
- 550 m²
- Planning reference
- 3281/18
- Location
- Clontarf, Dublin 3, Dublin
Location
Where the site is
- Area
- Clontarf, Dublin 3, Dublin
- County
- Dublin
Addresses on the notices
- the rear of site
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development consist of an amendment to a previous Grant of Permission (Reg. Ref: 4074/16). The amendment consists of (a) the construction of 2no. 3 bedroom, two- storey townhouse dwellings in place of 1 no. two-storey detached dwelling house at the rear of site; (b) the enlarging of on- curtilage car parking area and all other associated site works. Address: 8 COPELAND PLACE + 9 COPELAND Place, Clontarf, D3 +
Floor area stated for this source: 550 m².
Source unit value with scope not stated: 2 houses. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.