Site start
Housing site start — Stepaside
Stepaside, Dublin 18, Dublin
1 commencement notice · start date 14 Dec 2017 · planning reference given
Planning D17A/0524 · Planning application
- Commencement notices
- 1
- Latest start date
- 14 Dec 2017
- Latest notice
- Scale not stated
- Planning reference
- D17A/0524
- Location
- Stepaside, Dublin 18, Dublin
Location
Where the site is
- Area
- Stepaside, Dublin 18, Dublin
- County
- Dublin
Addresses on the notices
- this site
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
OptOut Permission for development at this site. The development comprises the construction of a single detached, 4 bed farmhouse dwelling part single storey part single storey with garden level to the rear, packaged waste water treatment system and sand polishing filter, and all ancillary site services and infrastructure and driveway with access from the existing entrance off the Ballyedmonduff Road.
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.