Site start

Site start — Carrigaline

Carrigaline, Cork

1 commencement notice · start date 02 Oct 2019 · planning reference given

Planning 19/4753 · Planning application

Commencement notices
1
Latest start date
02 Oct 2019
Latest notice
72 m²
Planning reference
19/04753
Location
Bridge Mt, Carrigaline, Cork

Location

Where the site is

Area
Carrigaline, Cork
County
Cork

Addresses on the notices

  • Bridge Mt, Carrigaline, Cork
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

The construction of a temporary, 72 square metre, single- storey portacabin modular building containing 1 No. classroom and 2 No. toilets and all other related ancillary site works at Gaelscoil Charraig Uí Leighin, Carrigaline Middle, Carrigaline, Co. Cork.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 72 m².

Planning reference 19/04753

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.