Site start
155 Arden View, Tullamore
Tullamore, Offaly
1 commencement notice · start date 22 Feb 2022 · no planning reference given
- Commencement notices
- 1
- Latest start date
- 22 Feb 2022
- Latest notice
- 100 m²
- Planning references
- None given
- Location
- 155 Arden View, Tullamore, Offaly
Location
Where the site is
- Area
- Tullamore, Offaly
- County
- Offaly
Addresses on the notices
- 155 Arden View, Tullamore, Offaly
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Installation and erection of 1 No. new temporary single storey prefabricated unit (ca.100m2) for Special Education Needs consisting of 1 No Classroom, Multi-sensory room, Safe Base, 2 No. Stores, User Assisted Toilet and 2 No. WC’s, 2 No standard WCs with lobby, 2 storerooms and External Ramp and Steps. The Provision of a soft play area, all located to the North of the existing School. The provision of 3 No. car parking spaces, of which one space is for disabled access, within the existing car park on the grassed area located to the South of the School together with all associated site works at Scoil Eoin Phoil II Naofa, Arden View, Tullamore, Co. Offaly.
Floor area stated for this source: 100 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.