Site start

Housing site start — Mullingar

Mullingar, Westmeath

2 commencement notices · latest start date 05 Mar 2026 · planning reference given

Planning 23134 · Planning application · Council file · external

View full project timeline

Commencement notices
2
Latest start date
05 Mar 2026
Latest notice
4 units
Planning reference
23134
Location
Mullingar, Westmeath

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Mullingar, Westmeath
County
Westmeath

Addresses on the notices

  • College Street, Mullingar, Co
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Westmeath County Council planning record Application details, status and decision record for 23134. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

The development will consist of the construction of a three‑storey residential building comprising two individual ground‑floor apartments, each with two bedrooms, and two duplex apartments—each with three bedrooms—located on the first and second floors.

Work stated for this notice 4 units Explicit phase quantity stated by the source.

Floor area stated for this source: 411 m².

Planning reference 23134
Notice 2 Commencement notice (owner-supplied)

Construction of 3 Units at College Street, Mullingar, Co. Westmeath

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 376 m².

Source unit value with scope not stated: 4 units. It is not presented as notice-specific scale.

Planning reference 23134

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.