Site start
Blackrock College senior school — site start
Blackrock, Dublin
1 commencement notice · start date 17 Apr 2025 · planning reference given
Planning D24A/0166 · Planning application
- Commencement notices
- 1
- Latest start date
- 17 Apr 2025
- Latest notice
- 110 m²
- Planning reference
- D24A/0166
- Location
- Blackrock College, Rock Road, Blackrock, Dublin
Location
Where the site is
- Area
- Blackrock, Dublin
- County
- Dublin
Addresses on the notices
- Blackrock College, Rock Road, Blackrock, Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The construction of 110sqm single-storey extension to the existing library structure, at Blackrock College senior school, to provide additional resource/ study areas, along with all ancillary site works.
Floor area stated for this source: 110 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.