Site start

Site start — Booterstown Avenue

Booterstown Avenue, Blackrock, Dublin

1 commencement notice · start date 24 Jul 2017 · planning reference given

Planning D16A/0324 · Planning application

View full project timeline

Commencement notices
1
Latest start date
24 Jul 2017
Latest notice
Scale not stated
Planning reference
D16A/0324
Location
Booterstown Avenue, Blackrock, Dublin

Location

Where the site is

Area
Booterstown Avenue, Blackrock, Dublin
County
Dublin

No usable public source coordinate or reviewed official planning boundary is available for this notice group.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

The provision to the existing sand based artificial grass hockey pitch of 4 no. 13.50m high floodlight masts to the north side of the pitch and 4 no. 15.00m high floodlight masts to the south side of the pitch, along with high level floodlighting to provide a maintained average 365 lux at pitch level, including all associated ductwork and reinforced concrete bases, including a 6m high green PVC coated metal mesh fencing to perimeter of pitch with access gates with 1800mm high ball stop netting above the fence behind the goals on west and east sides of the pitch, including all associated works to replace the existing perimeter fence gates and ball stop netting to the perimeter of the pitch all within the grounds.

Work stated for this notice Scale not stated for this notice.
Planning reference D16A/0324