Site start

Commercial site start — Clondalkin

Clondalkin, Dublin

1 commencement notice · start date 21 Apr 2026 · planning reference given

Planning SD25A/0082W · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
21 Apr 2026
Latest notice
1,614 m²
Planning reference
SD25A/0082W
Location
Ninth Lock Road, Clondalkin, Dublin

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
2
Completion certificates
1

Exact appeal 322854 · Contribution Appeal Decided · 2025-10-06 · Open official case

  1. Completion certificate validated South Dublin County Council · commencement notice Completion certificate · Certificate validation date 2026-08-25 See official certificate for completed works · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Clondalkin, Dublin
County
Dublin

Addresses on the notices

  • Ninth Lock Road, Clondalkin, Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file South Dublin County Council planning record Application details, status and decision record for SD25A/0082W. South Dublin County Council Official link · not recently checked Exact official source shared from the planning and approval record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Change of use from warehouse to self-storage use; • The demolition of the existing mezzanine floor (c. 53 sqm); • The construction of an additional floor measuring 797 sqm at 1st floor level, increasing the total gross floor area from 874.7 sqm to 1, 618 sqm; • Associated site signage measuring at 9 sqm; • Minor internal and external alterations to facilitate the change of use from warehouse to self-storage use; • All associated site development works including cycle parking provision1

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 1,614 m².

Planning reference SD25A/0082W

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.